Steel reinforcement-Jardine Matheson

strengthening Jardine Matheson with steel plate bonding and anchoring adhesive

reinforced Jardine Matheson

Project Name: the Bund No. 27 Jardine Matheson reconstruction project


Project introduction: new Jardine Matheson building was built in 1920, completed in November 1922. The building covers an area of 2100 square meters, construction area of 14300 square meters.


Project category: Civil Building


Project location: Shanghai, the Bund


Project time: July 2013


Project overview:the bearing capacity increases, the load increases, and the bearing capacity of the beam and column is strengthened


Engineering material


 HM-500 anchoring adhesive


anchoring adhesive



HM-120 epoxy bonded steel plate


bonded steel plate




المنتجات المستخدمة في هذا المشروعالأشخاص الذين تصفحوا هذا المشروع يهتمون أيضًا بهذه المنتجات

Back
Top
Close