Preventive measure of structural strengthening

Preventive measure of structural strengthening: CFRP strengthening, steel plate strengthening, post installed anchoring.


Preventive measure of structural strengthening


Item

Common problems

Preventive measure
Post installed anchor

The glue is not full enough; the distance between the steel bar and the hole wall is uneven

Glue injecting gun is used to post installed anchor, and two times correction is made after steel bar is implanted. The length of exposed steel bar is reasonably reserved, and the difficulty of planting bar is reduced.
Externally bonded CFRP wrapThe bond is not firm; carbon fiber cloth is not soaked; hollowing, etc.

Strengthen the grinding of the base and brush the primer glue.

The carbon fiber cloth is soaked with carbon fiber adhesive glue and then paste.

Roll along the same direction, carbon fiber selvage suitable for more glue.

Pate steel plate

Hollowing

The steel plate and the concrete surface are evenly coated with steel plate adhesive.

Strictly control the thickness of the steel plate glue.

Pressure perfusion glue is used for construction.


المنتجات الموصى بها

يمكنك العثور على أي شيء تحتاجه هنا ، ولديك ثقة في تجربة هذه المنتجات ، وسوف تجد الفرق الكبير بعد ذلك.

ألياف الكربون أحادية الإتجاة

تستخدم المواد البولیمریة المسلحة بألیاف الکربون في العدید من تطبیقات الهندسة الإنشائیة کتدعیم الأعمده، الکمرات، الجدران، البلاطات و الأسقف في المنشآت و المباني

أكثر من >

لاصق للاسطح الحديدية

مكون من اثنين من الايبوكسي تعديل الايبوكسي لاصقة تعزيز الهيكلية لوحة الصلب المستعبدين للخرسانة

أكثر من >

Back
Top
Close